Case Studies

Explore some of our transformative projects and the lasting impact we have driven across industries

Case Studies

Explore deeper into our expertise and take a look at some of our clients!

pexels-rdne-7580935.jpg

Fuel Strategy For CPP

Delivered direct savings of INR 6K Cr. over 5 years for ClientCo by devising and implementing auction strategy, driving a ~300% increase in booked volume and a ~30% reduction in KCal cost.

pexels-rdne-7580824.jpg

Rake Materialisation During Coal Crisis Of 2021-22 For CPP

Enabled ~3x increase in Coal materialization during the Coal Crisis by executing a Road-to-Rail conversion strategy, fast-tracking GPWIS rake induction, and coordinating with Railways to prioritize rake supply for ClientCo.   

Our impact

Fuel strategy for CPP

Delivered direct savings of INR 6K Cr. over 5 years for ClientCo by devising and implementing auction strategy, driving a ~300% increase in booked volume and a ~30% reduction in KCal cost.

Rake materialisation during Coal crisis of 2021-22 for CPP

Enabled ~3x increase in Coal materialization during the Coal Crisis by executing a Road-to-Rail conversion strategy, fast-tracking GPWIS rake induction, and coordinating with Railways to prioritize rake supply for ClientCo.   

GPWIS Co-ordination: Optimized Coal Logistics for CPP

Led seamless coordination of GPWIS, ensuring efficient tracking of rakes and preventing misallocation, which optimized coal movement for end consumers for CPP 

GPWIS Rakes.jpg

⁠Auction Support: Secured 20M MT & Cutting Costs by 30% for CPP

⁠Provided consultation and bidding strategy support, resulting in 20 million MT secured across multiple tranches and achieving ~30% reduction in kCal cost for CPP

WhatsApp Image 2025-02-24 at 13.18.49.jpeg

Coal Mine De-Linking: Safeguarded FSA for Cement Co

⁠Provided consultation and bidding strategy support, resulting in 20 million MT secured across multiple tranches and achieving ~30% reduction in kCal cost for CPP

Cement Delinking.avif

 ⁠Sustained Coal Availability: Boosted Materialization from 50% to 90% for IPP

⁠Enhanced materialization rate from below 50% to 90% on a sustained basis for over three years, ensuring higher coal availability and reliability for an IPP in North India

pexels-pixabay-459728.jpg

⁠Crisis Management Excellence: Tripled Coal Materialization for CPP

Enabled nearly a threefold increase in coal materialization during the Coal Crisis for CPP

pexels-bence-szemerey-337043-6804254.jpg

⁠FSA Rationalization: Enabled Diversified Coal Sourcing for IPP

Supported IPP with FSA Rationalisation to allow for procurement of Coal from diverse subsidiaries to improve cost mix 

Power Plant.jpg

Quota Swapping: Executed Q4 & Q2 Quota Swap for IPP

Supported with Q4 & Q2 quota swap for IPP to meet power demand, effectively becoming the first IPP in CIL history whose Quarter-quota was revised 

pexels-mikhail-nilov-7735694.jpg

State PCB Clearance: Supported IPP with State PCB Clearance after Ash Pond Breakage

Co-ordinated State PCB Clearance on account of Ash Pond breakage to ensure unhindered Coal supply in 2017 

Ash Pond.jpg

Name Change in FSA: Carried out for Multiple IPPs and CPPs

Co-ordinated name change process of multiple IPPs and CPPs

pexels-pixabay-48148.jpg