Fuel Strategy For CPP
Delivered direct savings of INR 6K Cr. over 5 years for ClientCo by devising and implementing auction strategy, driving a ~300% increase in booked volume and a ~30% reduction in KCal cost.

Rake Materialisation During Coal Crisis Of 2021-22 For CPP
Enabled ~3x increase in Coal materialization during the Coal Crisis by executing a Road-to-Rail conversion strategy, fast-tracking GPWIS rake induction, and coordinating with Railways to prioritize rake supply for ClientCo.
Our impact
Fuel strategy for CPP
Delivered direct savings of INR 6K Cr. over 5 years for ClientCo by devising and implementing auction strategy, driving a ~300% increase in booked volume and a ~30% reduction in KCal cost.
Rake materialisation during Coal crisis of 2021-22 for CPP
Enabled ~3x increase in Coal materialization during the Coal Crisis by executing a Road-to-Rail conversion strategy, fast-tracking GPWIS rake induction, and coordinating with Railways to prioritize rake supply for ClientCo.
GPWIS Co-ordination: Optimized Coal Logistics for CPP
Led seamless coordination of GPWIS, ensuring efficient tracking of rakes and preventing misallocation, which optimized coal movement for end consumers for CPP

Auction Support: Secured 20M MT & Cutting Costs by 30% for CPP
Provided consultation and bidding strategy support, resulting in 20 million MT secured across multiple tranches and achieving ~30% reduction in kCal cost for CPP

Coal Mine De-Linking: Safeguarded FSA for Cement Co
Provided consultation and bidding strategy support, resulting in 20 million MT secured across multiple tranches and achieving ~30% reduction in kCal cost for CPP

Sustained Coal Availability: Boosted Materialization from 50% to 90% for IPP
Enhanced materialization rate from below 50% to 90% on a sustained basis for over three years, ensuring higher coal availability and reliability for an IPP in North India

Crisis Management Excellence: Tripled Coal Materialization for CPP
Enabled nearly a threefold increase in coal materialization during the Coal Crisis for CPP

FSA Rationalization: Enabled Diversified Coal Sourcing for IPP
Supported IPP with FSA Rationalisation to allow for procurement of Coal from diverse subsidiaries to improve cost mix

Quota Swapping: Executed Q4 & Q2 Quota Swap for IPP
Supported with Q4 & Q2 quota swap for IPP to meet power demand, effectively becoming the first IPP in CIL history whose Quarter-quota was revised

State PCB Clearance: Supported IPP with State PCB Clearance after Ash Pond Breakage
Co-ordinated State PCB Clearance on account of Ash Pond breakage to ensure unhindered Coal supply in 2017

Name Change in FSA: Carried out for Multiple IPPs and CPPs
Co-ordinated name change process of multiple IPPs and CPPs